Battery voltage(RxBt) telemetry over CRSF protocol
CRSF to SBUS latency <7ms
Rated voltage: 4~5.5V @5V pad, 0~36V @VBAT pad
No 5V regulator built-in, VBAT pad is just for battery voltage sensing.
PCB size 15mm x 10mm, 0.6g
2pcs/package
LED status
slow blinks: CRSF-SBUS board doesn’t receive CRSF or SBUS signal, e.g., receiver is not bound with transmitter, receiver is not connected to UART of CRSF-SBUS board.
solid ON: CRSF-SBUS board and receiver are working normally.